- STEP TWO: how to make payment - T/T, bank wire, Western Union,
or Alibaba Trade Assurance recommended.
30 minutes through Credit Card
2-7 days through T/T
4-10 days through e-Checking
Select Language
$0.95100-499 piece
$0.8500-999 piece
$0.651000-4999 piece
$0.5≥5000piece
Payment Type: | T/T,Western Union |
Min. Order: | 1 piece |
Port: | NingBo,Shanghai,Shenzhen |
Place Of Origin: Zhejiang, China
Brand Name: TMWT
Model Number: YT-733TL-3
Warranty(Year): 1-Year
Certification: Ce
Light Source: Led
Support Dimmer: Yes
Lighting Solutions Service: Lighting And Circuitry Design
Application: Bedroom
Design Style: Modern
Lifespan (hours): 50000
Working Time (hours): 50000
Light Type: Touch Light
Lighting Period: 6 h
Power Source: 3*AAA dry battery(not include), Battery
Battery Type: Aaa
Feature: Easy to open back cover for changing batteries
Advantage: Adhesive mount,it can be hanged on ceiling or other smooth place
Lamp Power(W): 0.5
Input Voltage: 1.5v
Switch: Touch On/Off Switch
Usage: Room
Power Generation: Switch
Material: Abs
Switch Mode: Manual Button
Emitting Color: White
Selling Units | : | piece |
Package Type | : | unit pack: white box 400 pcs per carton carton size: 41*34*33CM Gross weight: 10KG |
The file is encrypted. Please fill in the following information to continue accessing it
Item No. | YT-733TL-3 |
Material | Plastic material, round shape with a mucilage at the back |
IP Rate | IP55, water resistant, rainproof |
Body Color | Silver |
Size & Net Weight | diameter 6.8cm high:2.0cm, weight 26g |
LED Type | 3 LED |
Emitted Color | cold white light |
Battery Type | 3*AAA batteries (not include) |
Working Time | 6-12 hours |
MOQ | 100pcs |
Sample Order | acceptable |
Unit Packaging | white box |
Logo | MOQ 1000pcs to do your own logo |
Custom Packaging | color box, blister, gift box for MOQ 1000pcs |
Warranty | 1 year |
- STEP ONE: Confirm the order quantity, unit packaging, shipping, and time for production and delivery
- STEP TWO: how to make payment - T/T, bank wire, Western Union,
or Alibaba Trade Assurance recommended.
30 minutes through Credit Card
2-7 days through T/T
4-10 days through e-Checking
- STEP THREE: start production after payment or deposit
- STEP FOUR: give you production schedule
- STEP FIVE: production finished and arrange the shipping
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.